Ballast mats
Installing Getzner ballast mats achieves a high degree of track elasticity. Vibrations and structure-borne noise are effectively reduced and the ballast is protected – and what's more: under ballast mats are easy to work with, can be installed quickly and can even be driven over by heavy construction equipment.
By using a special installation method, the under ballast mats have also proven extremely useful in track retrofits. The economic and technical performance of Getzner under ballast mats can be seen around the world. After all, over three million square metres of our under ballast mats have been installed on high-speed routes, standard-gauge railway lines and light rail systems!
The advantages for you
- Most effective method of achieving a defined level of elasticity in areas with a low ballast height
- Increased track quality
- Less vibration and structure-borne noise in ballasted track
- Optimum embedding of the ballast and improved load transfer
- Proven durability after more than 30 years in use
- Quick and simple installation
Product video ballast mat
Information brochures
Contacts
{"si":[11,294],"tr":[11],"pl":[17],"cz":[17],"sk":[17],"fr":[19],"lu":[19],"ru":[24],"ua":[24],"by":[24],"ee":[24],"lv":[24],"lt":[24],"md":[24],"bg":[24,244,294],"ge":[24],"az":[24],"am":[24],"tm":[24],"uz":[24],"kg":[24],"tj":[24],"kz":[24],"tl":[39],"pg":[39],"la":[39],"bt":[39],"np":[39],"il":[40],"br":[43],"cn":[94,270],"jp":[103,281],"de":[144,283],"kr":[151],"tw":[151],"nz":[151],"id":[151],"ph":[151],"bn":[151],"bd":[151],"my":[151],"sg":[151],"vn":[151],"hk":[151],"th":[151],"kh":[151],"mm":[151],"at":[163,294],"ve":[171],"co":[171],"ec":[171],"pe":[171],"cl":[171],"ar":[171],"bo":[171],"py":[171],"uy":[171],"ae":[232],"sa":[232],"eg":[232],"om":[232],"qa":[232],"kw":[232],"iq":[232],"ir":[232],"sy":[232],"lb":[232],"dz":[232],"ma":[232],"tn":[232],"ly":[232],"jo":[232],"ye":[232],"hr":[244,294],"ba":[244,294],"hu":[244,294],"rs":[244,294],"me":[244,294],"al":[244,294],"mk":[244,294],"gr":[244,294],"ro":[244,294],"gb":[246,294],"ie":[246],"au":[252],"it":[255,294],"dk":[256],"no":[256],"fi":[256],"us":[258],"ca":[258],"es":[262,294],"pt":[262,294],"se":[266],"in":[272],"ch":[294],"li":[294]}
Downloads
7 documents available • Download all
Brochure Under Ballast Mats EN
1.06 MB
Brochure Heavy Freight Solutions for Heavily Loaded Rail Tracks EN
1.67 MB
Brochure Optimisation of Transition Zones EN
1.83 MB
Brochure Optimisation of Turnouts EN
715.5 KB
Case Study Gotthard Base Tunnel EN
415.43 KB
Case Study 30 years of vibration protection for the Philharmonic Hall Gasteig EN
702.24 KB
Reference list Under Ballast Mats EN
143.82 KB