道砟垫
通过安装 Getzner 道砟垫可以获得较高的轨道弹性。 震动和结构噪音有效降低,道砟得到保护——更多信息: 道砟垫处理容易、安装快速,并且可以经受住重型建筑设备。
道砟垫结合特殊工艺也可适用于改造工作。 全世界三百多万平方米的安装面积充分证明了 Getzner 道砟垫的经济性和技术有效性! 其已广泛应用在高速、重轨和短途交通路线中。
优势
- 在较低道砟高度范围内达到特定弹性的最有效方法
- 轨道铺设质量得到提升
- 道砟上部结构的震动和结构噪音减弱
- 道砟的最佳嵌入和得到改善的负载分布
- 已投入使用超过 30 年,证明了其耐久性
- 安装快速便捷
产品视频
信息手册
联系方式
{"si":[11,294],"tr":[11],"pl":[17],"cz":[17],"sk":[17],"fr":[19,271],"lu":[19],"ru":[24],"ua":[24],"by":[24],"ee":[24],"lv":[24],"lt":[24],"md":[24],"bg":[24,244,294],"ge":[24],"az":[24],"am":[24],"tm":[24],"uz":[24],"kg":[24],"tj":[24],"kz":[24],"tl":[39],"pg":[39],"la":[39],"bt":[39],"np":[39],"il":[40],"br":[43],"cn":[94,270],"jp":[103,281],"de":[144,283],"kr":[151],"tw":[151],"nz":[151],"id":[151],"ph":[151],"bn":[151],"bd":[151],"my":[151],"sg":[151],"vn":[151],"hk":[151],"th":[151],"kh":[151],"mm":[151],"at":[163,294],"ve":[171],"co":[171],"ec":[171],"pe":[171],"cl":[171],"ar":[171],"bo":[171],"py":[171],"uy":[171],"ae":[232],"sa":[232],"eg":[232],"om":[232],"qa":[232],"kw":[232],"iq":[232],"ir":[232],"sy":[232],"lb":[232],"dz":[232],"ma":[232],"tn":[232],"ly":[232],"jo":[232],"ye":[232],"hr":[244,294],"ba":[244,294],"hu":[244,294],"rs":[244,294],"me":[244,294],"al":[244,294],"mk":[244,294],"gr":[244,294],"ro":[244,294],"gb":[246,294],"ie":[246],"au":[252],"it":[255,294],"dk":[256],"no":[256],"fi":[256],"us":[258],"ca":[258],"es":[262,294],"pt":[262,294],"se":[266],"ch":[271,294],"in":[272],"li":[294]}
下载
7 文档可提供 • 全部下载
Brochure Under Ballast Mats ZH
588.92 KB
Brochure Heavy Freight Solutions for Heavily Loaded Rail Tracks EN
1.67 MB
Brochure Optimisation of Transition Zones EN
1.83 MB
Brochure Optimisation of Turnouts EN
715.5 KB
Case Study Gotthard Base Tunnel ZH
589.09 KB
Case Study 30 years of vibration protection for the Philharmonic Hall Gasteig EN
702.24 KB
Reference list Under Ballast Mats EN
143.82 KB